Rep 4.7 Fuser Drive Assembly - Xerox Phaser 7100 Service Manual

Hide thumbs Also See for Phaser 7100:
Table of Contents

Advertisement

REP 4.7 Fuser Drive Assembly

PL 4.2.16
WARNING:
The Fuser may be hot. Turn the printer power Off and allow at least 30 minutes for
the Fuser to cool before removing the Fuser.
1.
Press the B button and open the Front Cover Assembly (PL 1.1.38).
2.
Remove the Fuser Unit
3.
Release latch A and open the Front Frame Assembly (PL 4.1.6) until it is in a position where it is
convenient to perform the operation and maintain that position to perform the subsequent steps.
4.
Remove the Left Latch Lever
Xerox Internal Use Only
(REP 10.1 Fuser Unit
on page 4-183).
(REP 4.4 Right/ Left Latch Lever, Latch Spring
Service Parts Disassembly
s7100-253
on page 4-89).
Phaser 7100 Service Manual
s7100-325
4-99

Advertisement

Table of Contents
loading

Table of Contents