Model 3610 Dsu Electrical Connection - Paradyne COMSPHERE 3610 Operator's Manual

Data service units
Hide thumbs Also See for COMSPHERE 3610:
Table of Contents

Advertisement

Power-Up Routine
When power is applied, the DSU:
Determines what options (DBM, MUX-TDM or
MCMP) are installed, if any.
Runs a Device Test on itself and each of the
installed options.
During the tests, all indicators on the DCP light
briefly and the message Power-Up Tests appears
on the liquid crystal display (LCD).
Displays the results of each test momentarily as
Pass, Fail, or Abrt. (Abrt indicates that the Device
Test was aborted because a network loopback was
in progress during the power-up procedure.) These
tests take about 20 seconds to complete.
3610-A2-GB91-90
Figure 2-3. Model 3610 DSU Electrical Connection
July 1999
If the DSU fails the power-up test:
"
Procedure
1. Confirm the hardware options that are installed, if
any.
2. Go to the Configuration (Confg) branch, load and
save a factory-set configuration (FacC or FacT).
3. Return to the Test branch.
4. Re-execute the Device Test. If the test passes,
continue with this procedure.
If the test fails again, contact your service
representative for information on how to return the DSU.
Since the DSU is not connected to the network, the red
Alrm indicator is lit and the LCD displays No Signal to
indicate a facility alarm. The LCD displays Health and
Status information as described in the
section of Chapter 4.
Model 3610 Installation
Status Branch
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comsphere 3611Comsphere 3600 series

Table of Contents