Prior to powering up ATevo for the first time, it is recommended that:
• You have followed installation instructions carefully.
• You check that ac input supply voltage and battery voltage match information on ATevo
nameplate.
• If ATevo features the Multi-Tap option, verify the ac input jumpers on INPUT VOLTAGE
SELECTION terminal block are correct for the ac supply voltage (see
Verifying Multi-Tap AC Input Voltage
• Open the front panel, and check battery polarity at the DC Output Circuit Breaker (CB2+/-
).
Copyright HindlePower Inc. 2021
ATevo O&SI - 1PH Input Group I (6-25 Adc) - 1.1_en
Setting).
Section 2.3.2,
Last modified: 3 August 2023
Page 85 of 316

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ja5011-51

Table of Contents