4.1.1.
4.1.1. Understanding the Startup
Understanding the Startup
Sequence
Sequence
ATevo is pre-configured to work with most common batteries and loads without further
adjustment.
When you start ATevo for the first time, the charger will:
• Use the
FACTORY SETTINGS
tables. These settings may be changed after startup if necessary.
• Take about fifteen (15) seconds to start. Control circuitry will "soft start" ATevo, such that
DC output voltage and current increase gradually to rated values.