HindlePower ATevo Series Operating/Service Instructions Manual page 267

Hide thumbs Also See for ATevo Series:
Table of Contents

Advertisement

HindlePower Inc
13.11.
13.11. Troubleshooting Forced Load
Troubleshooting Forced Load
Sharing ATevos
Sharing ATevos
• Ensure that at least one ATevo is configured as Primary on Port 2 or 3, and a Serial
Communication Adapter (A13) is plugged into that port.
• Ensure that at least one ATevo is configured as Secondary on Port 2 or 3, and a Serial
Communication Adapter (A13) is plugged into that port.
• Ensure that each Serial Communication Adapter board (A13x) used for Forced Load
Sharing is configured for RS-485, and is wired correctly.
• Verify that all ATevos are communicating. The Serial Communication Adapters (A13) have
a YELLOW and GREEN LED that light briefly when the ATevo is sending or receiving data
respectively. These LEDs can be used to identify the problem source.
• Verify the voltage cabilbration of all ATevos connected in Forced Load Sharing.
Copyright HindlePower Inc. 2021
ATevo O&SI - 1PH Input Group I (6-25 Adc) - 1.1_en
Last modified: 2 August 2023
Page 267 of 316

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ja5011-51

Table of Contents