HindlePower Inc
ATevo O&SI - 1PH Input Group I (6-25 Adc) - 1.1_en
7.8.
7.8. AC Metering – optional
AC Metering – optional
If an optional ac metering module is supplied with ATevo, voltage level(s) and current flow from
the ac input power source can be measured. For further information regarding ATevo ac
metering, refer to supplemental instructions (JA5124-03).
Last modified: 27 July 2023
Copyright HindlePower Inc. 2021
Page 182 of 316