HVC-R 100/150 V2 E-Bus Charger Installation Guide
5.9. Connecting the communication cable to the Power Cabinet
Prerequisites:
Tools: ty-raps
5.9.1. Routing the cable to the terminal blocks
Preferred cable route
Route the communication fiber cable to module D1 (B) and D2 (A). Refer to the figure for the
preferred cable route inside the cabinet.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Page 80 of 133