ABB HVC-R 100/150 V2 Installation Manual page 85

E-bus charger
Table of Contents

Advertisement

HVC-R 100/150 V2 E-Bus Charger Installation Guide
Removing the pedestal's rear cover plate.
5. Carefully position the Pedestal (B) next to the foundation (D).
6. Pull the cables (E) through the opening (F).
Indication of the way the pedestal should be place on the foundation.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Page 85 of 133

Advertisement

Table of Contents
loading

Table of Contents