Placement Of Multiple Power Cabinets - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

Specifications for indoors installation of the Power Cabinet
Airflow required for one cabinet = 1450 m
Maximum allowed pressure drop = 300 Pa. If the pressure drop of the room is higher
than 300 Pa an extra fan should be placed. Contact ABB Sales department (see
Contact information on Page 12 for contact details).

3.6.2. Placement of multiple Power Cabinets

There are two possible configurations for the placement of multiple HVC 100/150 V2 systems,
see picture below:
Possible placements of multiple Power Cabinets
The Power Cabinets can be placed back-to-back or next to each other with their doors facing
the same direction.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
3
/h.
Page 29 of 133

Advertisement

Table of Contents
loading

Table of Contents