ABB HVC-R 100/150 V2 Installation Manual page 41

E-bus charger
Table of Contents

Advertisement

This extra cable length is required to connect the AC power cable with
the connectors in the Power Cabinet without problems.
11. Place both cover plates in the designated locations of the foundation.
12. Secure the top cover plate with M16 bolts (4x) and the front cover plate with M12 bolts
(4x).
These cover plates are required to prevent people from falling into the
foundation.
13. Fill the open space in the ground around the foundation and the channels for the conduits
with filling material (e.g. sand). Filling material is packed 2 – 3 times with a packing
machine until the desired ground level is obtained. Avoid having filling material enter the
foundation.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
WARNING
Page 41 of 133

Advertisement

Table of Contents
loading

Table of Contents