Open The Cable Inlet And Remove The Cable Gland; Guide The Cables Through The Opening In The Cable Guide Plate; Install The Cabinet On The Foundation - ABB ADC-90-200-C1 Operation And Installation Manual

All-in-one 90kw dc fast charger
Table of Contents

Advertisement

Installation
5.5.2

Open the cable inlet and remove the cable gland

Preliminary requirements
Procedure
1. Open the front and right doors. Refer
to section 8.1.
2. Loosen the fasteners (A).
3. Move the sliding plate (B) to open the
cable inlet.
4. If it is necessary, remove the cable
gland (C) for the Ethernet cable.
5.5.3

Guide the cables through the opening in the cable guide plate

Preliminary requirements
Procedure
1. If it is necessary, install the cable
gland (A) over the Ethernet cable (B).
2. Guide the wire (C) of the tilt sensor
through the cable inlet.
3. Guide the wires (D) of the AC input
cable, the PE wire and the earthing
conductor for the enclosure through
the cable inlet.
4. Pull the wires and cable through the
gland plate and the cable inlet. Apply
the full cable slack.
5. Close the sliding plate (E).
6. Tighten the fasteners (F).
7. Close the doors. Refer to section 8.2.
5.5.4

Install the cabinet on the foundation

Preliminary requirements
48
Installation engineer
Caution: If the cable gland
for the Ethernet cable is not
used, make sure that the
cable gland is closed and
sealed
The front and right doors
are open.
The cable inlet is open.
Installation engineer
Open spanner. Refer to
section 10.5.
A
B
Installation engineer
D
F
E
Fasteners. Refer to section
10.6.
9AKK108466A3703-EN | 001
C
A
C
B
A
F

Advertisement

Table of Contents
loading

Table of Contents