Cable Routing; Charge System Configuration - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

2.
In case of a concrete or stone wall, insert wall-plugs (4x) into the holes.
The activities regarding the installation of cable ducts, that are to contain
the cables connecting the Dual Depot Charge Box, are entirely
dependent on the installation location and may differ between specific
locations. Due to this reason, the installation of those cable ducts is out
of scope of this Installation Guide.
The installation, as well as previous preparation of a routing plan, of the
cable ducts is a responsibility of the Contractor.

4.4. Cable routing

4.4.1. Charge system configuration

There are various cabling solutions, depending on the installation.
Overview of electrical connections of a charge system with one Dual Depot Charge Box
Overview of electrical connections of a charge system with one Dual Depot Charge Box
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
supplied with AC power from Power Cabinet
supplied with AC power from distribution board
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
Page 47 of 133