Mounting The Dual Depot Charge Box Onto The Pedestal - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.12.2.

Mounting the Dual Depot Charge Box onto the Pedestal

Prerequisites:
All packaging material is removed from the Pedestal.
A minimum of two people is required.
Tools: torx screwdriver (size TT20).
Make sure that personnel cannot be crushed or become trapped while
moving the Dual Depot Charge Box.
Warranty
Any damage caused during the process of moving the Dual Depot
Charge Box to its position is not covered by the warranty.
Do not use a compressor to clean the Dual Depot Charge Box. Use a
vacuum cleaner.
Mounting the Dual Depot Charge Box onto the pedestal
1. Carefully place the Dual Depot Charge Box against the Pedestal.
2. Make sure that the Dual Depot Charge Box is aligned with the holes in the metal plate
of the Pedestal.
3. Insert the M6 bolts (C), washers (B) and spring washers (A) into the holes on the back
side of the Pedestal (4x).
4. Tighten the bolts/nuts with a tightening torque of 10 – 15 Nm.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
WARNING
CAUTION
CAUTION
Page 87 of 133

Advertisement

Table of Contents
loading

Table of Contents