5.4. Moving the Power Cabinet

There are two options to move the Power Cabinet from the delivery truck to the location.
Use a hoist to lift the cabinet from the top. See Moving the Power Cabinet with a hoist
on Page 59.
Use a forklift truck to lift the cabinet from the bottom. See Moving the Power Cabinet
with a forklift truck on Page 60.
Prerequisites:
All packaging material is removed from the Power Cabinet.
The two cover plates are removed from the foundation.
The tapped holes of the foundation are free from dust. If necessary, clean the holes
with a vacuum cleaner. Use a thread tap to make sure that the bolts will go in smoothly.
Make sure that the main switch of the power supply group for the product
is set to the OFF position. Do a voltage check to make sure that the
electrical power is disconnected from the system. Secure against
resetting.
Make sure that personnel cannot be crushed or become trapped while
moving the Power Cabinet.
Warranty
Any damage caused during the process of moving the Power Cabinet to
its position is not covered by the warranty.
Do not use a compressor to clean the Power Cabinet. Use a vacuum
cleaner.
1.
Use one of the two options to move the Power Cabinet to the foundation.
2.
When the Power Cabinet is about 500 mm above the desired location, continue the
installation procedure with Installing the Power Cabinet onto a foundation on Page 61.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
DANGER
WARNING
CAUTION
CAUTION
Page 58 of 133

Advertisement

Table of Contents
loading

Table of Contents