ABB HVC-R 100/150 V2 Installation Manual page 114

E-bus charger
Table of Contents

Advertisement

Instructions on preparing and connecting the PE wire
1. It is necessary to connect the cover plate and the pedestal with a PE wire. Prepare a
wire of appropriate length – no longer than allowing to open the rear cover plate.
2. Strip the length of the insulation specified by the size of the wire end rings (G) at both
ends of the wire.
3. Attach wire end rings (G) at the ends of the wire.
4. Place the contact washers (J), the ends of the PE wire (L) and the toothed washers (I)
onto the GND points (E, F).
5. Screw the M8 nuts (K) onto the GND points (D, E).
6. Tighten the nuts with a tightening torque of 15 Nm.
7. Place the front cover plate (A) against the front side of the Pedestal (B).
8. Insert the M6 bolts (C) into the holes (8x) and tighten them.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
Page 114 of 133

Advertisement

Table of Contents
loading

Table of Contents