ABB HVC-R 100/150 V2 Installation Manual page 118

E-bus charger
Table of Contents

Advertisement

HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
If the HVC-R 100/150 E-Bus Charger is exposed to rain, it is sufficient to
clean it twice a year.
CAUTION
Do not use high-pressure water jets. Water may leak into the Power
Cabinet. If a high-pressure water jet has been used, make sure that the
inside of the Power Cabinet is dry.
- Only use cleaning agents with pH value between 6 and 8.
- Do not use cleaning agents with abrasive components.
- Do not use abrasive tools.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Page 118 of 133

Advertisement

Table of Contents
loading

Table of Contents