ABB HVC-R 100/150 V2 Installation Manual page 36

E-bus charger
Table of Contents

Advertisement

Example of civil installation when the Dual Depot Charge Box is mounted on a wall
A
Foundation of the Power Cabinet
B
Wall on which the Dual Depot Charge Box will be mounted
C
Flexible conduit for DC power cables
D
Flexible conduit for AC auxiliary power, PE wire and data cables
E
AC power cable for Power Cabinet
Document the location of all the cables placed in the ground between the
Power Cabinet and the Dual Depot Charge Box. The routing of the cables
must be known to prevent damage caused, e.g. by excavation works.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
Page 36 of 133