Attaching Pe Wire Connecting The Dual Depot Charge Box - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.6.6. Attaching PE wire connecting the Dual Depot Charge Box

Prerequisites:
Tools: wire cutter, wire stripper pliers, wire-end ring, spanner (size 19), torque wrench
(size 19).
Method of connecting the PE wire connecting the Dual Depot Charge Box
1.
Cut the PE wire of the power cable to the proper length to reach the PE rail. Do not make
the wire routing neither too tight nor too loose.
2.
Strip 20 mm of the insulation from the end of the PE wire.
3.
Attach a wire end ring (A) to the end of the PE wire (B).
4.
Remove the M12 bolt, nut and washers from the PE rail.
5.
Fit the bolt (C) with toothed washer (D), the PE wire (B) and the contact washer (E).
6.
Insert the bolt fitted with the PE wire into the PE rail.
7.
Screw from the bottom of the PE rail a toothed washer (D) and a nut (F) on the bolt (C)
8.
Tighten the bolt/nut connection with a tightening torque of 30 Nm.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
Page 74 of 133