Wall-Mounting Brackets For Dual Depot Charge Box Safe Wall Fixing; Communication Ethernet Cable - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

2.2.4. Wall-mounting brackets for Dual Depot Charge Box safe wall fixing

The Dual Depot Charge Box (A) can be easily mounted onto a wall with wall mounting
brackets (B).
Amount
Part number
ABB6AGC083492
*
1
(*)
pack quantity is 4

2.2.5. Communication ethernet cable

The CAN/Ethernet communication between the Power Cabinet and Dual Depot Charge Boxes
is achieved via an Ethernet cable.
If the cable is not supplied by ABB, then gland dimensions listed in section Gland layout of the
Dual Depot Charge Box on Page 91 must be followed. Please note that special precautions
should be taken, so that pre-fabricated the cable could pass through the gland (for example
order cable with M25 gland assembled on it). Another alternative could be to crimp the cable
on site after passing through the gland.
Cable length must be defined by the Contractor performing installation during site survey.
Amount
Part number
1
Contact ABB for details
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Wall mounting bracket
Description
Standard wall-mounting bracket (ABB)
Description
Ethernet (S/FTP, CAT6) with RJ45 connectors
HVC-R 100/150 V2 E-Bus Charger Installation Guide
Page 21 of 133

Advertisement

Table of Contents
loading

Table of Contents