Mounting The Dual Depot Charge Box Onto A Wall - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.13.

Mounting the Dual Depot Charge Box onto a wall

Prerequisites:
All packaging material is removed from the Dual Depot Charge Box.
A minimum of two people is required.
Tools: spanner (size 13).
Make sure that personnel cannot be crushed or become trapped while
moving the Dual Depot Charge Box.
Warranty
Any damage caused during the process of moving the Dual Depot
Charge Box to its position is not covered by the warranty.
Do not use a compressor to clean the Dual Depot Charge Box. Use a
vacuum cleaner.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
WARNING
CAUTION
CAUTION
Page 88 of 133

Advertisement

Table of Contents
loading

Table of Contents