Connecting The Interlock Cable To The Next Dual Depot Charge Box - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

Functional description
Interlock In (*)
Interlock Out (**)
DC Guard A
DC Guard A GND
Interlock GND
(*) Interlock Out in Power Cabinet.
(**) Interlock In in Power Cabinet.
See also Appendix F Signal connection diagram.
12. Tighten the connector screws of the terminal blocks with a tightening torque of 1.3 Nm.
5.14.10.
Connecting the InterLock cable to the next Dual Depot Charge
Box
Location of terminal blocks X4 and the preferred cable route.
Positions of terminal blocks X4 required for connection of InterLock.
1. Loosen and remove the cable gland's (#01) nut for the Interlock cable.
2. Slide the cable gland's nut over the Interlock cable.
3. Route the Interlock cable through gland #01 to the terminal blocks X4. Refer to the
figure above for the preferred cable route through the cable duct inside the cabinet.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
Connector
Wire color
X3-2
White
X3-3
Brown
X3-6
Green
X3-7
Yellow
X3-1
Shield
Page 103 of 133

Advertisement

Table of Contents
loading

Table of Contents