Installing Lightning Protection (Optional) - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

Leave the main switch OFF.
The Power Cabinet is not ready to use yet.
If there is no appointment for commissioning yet, contact the ABB
Delivery department to make an appointment for commissioning. See
Contact information on Page 12 for contact details.

5.6.5. Installing lightning protection (optional)

Prerequisites:
Tools: wire cutter, wire stripper pliers, wire-end ring, spanner (size 19), torque wrench
(size 19).
Method of connecting the lightning protection wire
1.
Cut the wire of the lightning protection cable to the proper length to reach the PE rail. Do
not make the wire routing neither too tight nor too loose.
2.
Strip 20 mm of the insulation from the end of the wire.
3.
Attach a wire end ring (A) to the end of the lightning protection wire (B).
4.
Remove the M12 bolt, nut and washers from the PE rail.
5.
Fit the bolt (C) with toothed washer (D), the lightning protection wire (B) and the contact
washer (E).
6.
Insert the bolt fitted with washers and the lightning protection wire into the PE rail.
7.
Screw from the bottom of the PE rail a toothed washer (D) and a nut (F) on the bolt (C)
8.
Tighten the bolt/nut connection with a tightening torque of 30 Nm.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
WARNING
Page 73 of 133

Advertisement

Table of Contents
loading

Table of Contents