Hvc Power Cabinet - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

2.1.5. HVC Power Cabinet

Outside view of the HVC 100
A
Base cover
B
Air outlet
C
Door
Inside view of the HVC 100/150 V2 Power Cabinet
A Main switch
B AC Power connection
C Guidance plate of the cables
2
Two 50 kW Power Modules installed in the cabinet instead of three.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
2
/150 V2 Power Cabinet
Overview of the closed Power Cabinet
D
E
F
Overview of the open Power Cabinet
D Data/communication connection
E Display
F Power Modules (only two are
installed in the HVC 100)
HVC-R 100/150 V2 E-Bus Charger Installation Guide
3G Antenna
Air inlets (also on the left and back side)
Door handle / lock
Page 15 of 133

Advertisement

Table of Contents
loading

Table of Contents