Installing Border Covers Of The Power Cabinet - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.5.6. Installing border covers of the Power Cabinet

Only applicable when the Power Cabinet is placed on a concrete
foundation.
Prerequisites:
Tools: torx screwdriver (size 2163TX-T30).
M5 bolts (8x) previously removed from the Power Cabinet (bag containing parts).
1.
Put the front cover (A) against the bottom front of the Power Cabinet by aligning the four
bolts at the back side of the front cover (A) with the holes in the bottom front.
2.
Put the rear cover (B) against the rear front of the Power Cabinet.
3.
Insert the M5 bolts (C) into the holes (8x).
4.
Tighten the bolts.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Attaching border covers to the Power Cabinet
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
Page 66 of 133

Advertisement

Table of Contents
loading

Table of Contents