Unpacking The Dual Depot Charge Box; Before Unpacking; Removing Packaging - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.11.

Unpacking the Dual Depot Charge Box

5.11.1.

Before unpacking

Do not pollute the environment with plastic and cardboard packaging.
Dispose of the packaging elements according the regionally applicable
regulations regarding the environment.
Prerequisites:
All construction works are completed.
The product is delivered by a transport company at the confirmed date of delivery.
Check the box for damages.
5.11.2.

Removing packaging

Prerequisites:
The installation work must be carried out by, at least, two people.
Make sure that personnel cannot be crushed or become trapped while
moving the Dual Depot Charge Box (and pedestal) out of the box.
Warranty
Any damage caused during the process of moving the Power Cabinet to
its position is not covered by the warranty.
1. Unpack the Dual Depot Charge Box.
2. Remove the bag which contains the keys, cover caps and mounting materials. The
bag is attached with tape to one of the cable holders.
3. Lift the Dual Depot Charge Box out of the box.
4. Place the Dual Depot Charge Box on the ground with its top facing up.
5. Remove all protective foam from the Dual Depot Charge Box.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
CAUTION
WARNING
CAUTION
Page 83 of 133

Advertisement

Table of Contents
loading

Table of Contents