Installing Border Covers Of The Metal Frame Foundation - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.5.7. Installing border covers of the metal frame foundation

Only applicable when the Power Cabinet is placed on a metal frame
foundation. The supplied front and rear cover on the Power Cabinet are
not to be used in this case.
Prerequisites:
Tools: torx screwdriver (size 2163TX-T30).
Attaching border covers to the Power Cabinet's metal frame foundation
1.
Put the front border cover (A) against the bottom front of the Power Cabinet.
2.
Put the rear border cover (B) against the rear front of the Power Cabinet.
3.
Insert the M5 bolts (C) into the holes (8x).
4.
Tighten the bolts.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
Page 67 of 133

Advertisement

Table of Contents
loading

Table of Contents