Connect Cables; Connect Pe Of Power Cable - ABB Terra DC Wallbox C UL Installation Manual

Three-phase version
Hide thumbs Also See for Terra DC Wallbox C UL:
Table of Contents

Advertisement

2. Push the cables back through the gland plate, until sufficient cable length is left to reach the cable
terminals. Ensure the PE cable is longer than the other cables.
3-Phase Connection using flexible
3.
Slide the cable cover and tighten the two screws.
If a wired internet connection is not used, please ensure the cable entry hole is closed, to assure the
IP54 grade of the cabinet, and prevent insects and small animals to enter the cabinet.
5.5

Connect cables

5.5.1
Preconditions:
Tools: Wire stripper pliers; wire-end lug pliers; wire-end lug.
1. Cut the PE wire of the power cable to the correct length (longer than the other phases) to reach the
PE connector.
20 2 0- 10- 05

Connect PE of power cable

DANGER
Hazardous voltage
Make sure that the main switch of the power supply group for the
product is set to the OFF position. Perform a voltage check and
make sure that the electrical power is disconnected from the sys-
tem. Follow recommended
T ER R A DC WA LL BOX U L
NFPA-70e
procedures.
Conduit
Installation
1.25" secured to
bottom
mounting area.
1-phase Version
Shown
2 9/ 3 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra dc wallbox cj ulTerra dc wallbox ul

Table of Contents