ABB HVC-R 100/150 V2 Installation Manual page 100

E-bus charger
Table of Contents

Advertisement

HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
The connections presented below should be executed by leading the
required cables through the conduit (A) located behind the connections
bars (B). Utilize tie wraps to attach the cables to the holders (C).
Location of the cable conduit and holders.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Page 100 of 133

Advertisement

Table of Contents
loading

Table of Contents