Next steps are only applicable if the Dual Depot Charge Box is to be installed on a pedestal.
6.
Unpack the pedestal.
7.
Remove the cover of the wooden box.
8.
Lift the pedestal out of the box.
9.
Place the pedestal on a secure surface with its top facing up.
To prevent damage to the paint layer of the pedestal, always place the
pedestal on a secure surface that provides sufficient protection against
scratches and other damage.
ABB is not responsible for any damage caused to the pedestal during its
unpacking.
10. Remove all protective foam from the pedestal.
5.12.

Installing the Dual Depot Charge Box onto a Pedestal

5.12.1.

Connecting the Pedestal to the Foundation

Prerequisites:
All packaging material is removed from the Pedestal.
A minimum of two people is required.
Tools: torx screwdriver (size T30), spanner (size 19).
1. Remove the front cover plate (A) from the Pedestal (B) by loosening the bolts (C) (8x).
2. Put the front cover plate (A) and the bolts (C) in a safe location as they will be installed
back later on.
3. Remove the rear cover plate (H) from the Pedestal (B) by loosening the bolts (G) (6x).
4. Put the rear cover plate (H) and the bolts (G) in a safe location as they will be installed
back later on.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
Removing the pedestal's front cover plate.
HVC-R 100/150 V2 E-Bus Charger Installation Guide
CAUTION
Page 84 of 133

Advertisement

Table of Contents
loading

Table of Contents