4.3. Mounting of the Dual Depot Charge Box

4.3.1. Available options

There are two options to install the Dual Depot Charge Box:
Soil
Use the concrete foundation to get a firm fixation on soil in combination with the
pedestal. The concrete foundation and pedestal can be ordered separately. See
section Accessories on Page 18.
Wall mounting
The Dual Depot Charge Box can be mounted on a solid wall.

4.3.2. Concrete foundation for the pedestal

Dimensions necessary for civil installation of the foundation. (All dimensions given in [mm])
Make sure that personnel cannot be crushed or become trapped while
moving the foundation. Be aware that the weight of the concrete
foundation is about 535 kg.
Before you lower the foundation, remove sharp edges of the cable holes
(B) in the foundation to protect the cables.
1. Prepare a hole in the ground with a minimum depth of 850 mm, as shown in the
figure above.
2. Fill the hole with (minimum) 200 mm of lean concrete (C), see figure above.
3. Make sure that the conduits are routed to the indicated positions (B).
4. Use the provided VP-covers for those holes on the foundation sides that will not be in
use.
5. Lower the foundation (A) into the hole.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
WARNING
CAUTION
Page 44 of 133

Advertisement

Table of Contents
loading

Table of Contents