Installing Front Cover Plate On The Foundation - ABB HVC-R 100/150 V2 Installation Manual

E-bus charger
Table of Contents

Advertisement

5.5.8. Installing front cover plate on the foundation

Only applicable when the Power Cabinet is placed on a concrete
foundation.
Prerequisites:
Tools: spanner (size 19)
Attaching cover plate to the concrete foundation
1.
Place the front cover plate (B) on the foundation (A).
2.
Make sure that the front cover plate (B) is aligned with the tapped holes within the
foundation.
3.
Insert the M12 bolts (C) into the holes (4x).
4.
Tighten the bolts.
Document: v0.1 / Document No.: TBA | Date: XX-08-2021
HVC-R 100/150 V2 E-Bus Charger Installation Guide
NOTICE
Page 68 of 133

Advertisement

Table of Contents
loading

Table of Contents