TRANSMISSION
24. Install rear fenders and fender flairs.
25. Fill coolant reservoir. Bleed system as required. See
and Cooling System Bleeding, page 2.38.
26. Check and fill engine oil as required. See Engine Oil
Level, page 2.28.
27. Connect
the
battery.
specification.
TORQUE
Battery Fasteners:
60 in-lbs (7 Nm)
TRANSMISSION VENT LINE ROUTING
The transmission vent line connects to a nipple
side of the transmission near the transmission switch.
The vent line routes up through the gap
MAG and PTO intake runners.
The line runs parallel with the fuel supply and return lines
and is retained by a zip tie
front bracket. The line terminates to open air (does not
terminate to a fitting or hole in the frame).
6.10
Torque
fasteners
q
on the
w
between the
e
attached to the cargo box
TRANSMISSION DISASSEMBLY
Refer to the exploded view at the end of this chapter as
to
1. Place transmission in high gear.
2. Drain and properly dispose of transmission fluid.
3. Remove bell crank nut
e
4. Remove E-clip
and gear selector switch
5. Remove sector cover bolts
6. Remove detent spring , detent pawl and detent star.
Note the master spline on the detent star and the shift
shaft.
9928491 R04 - 2017-2018 RZR XP Turbo / XP4 Turbo Service Manual
NOTE
a reference.
q
w
and bell crank
.
retaining the spring washer, washer
r
.
t
and remove the cover.
© Copyright Polaris Industries Inc.