Figure 52 Removing And Installing A Node Power Supply - Quantum DXi6900 Field Service Manual

With dxi 3.4.0 software
Hide thumbs Also See for DXi6900:
Table of Contents

Advertisement

Chapter 3: FRU Removal and Replacement Procedures
Replacing Node Power Supplies
Figure 52 Removing and
Installing a Node Power Supply
98
Connector
Installing a Replacement Power Supply in the Node
To install the replacement power supply in the DXi6900 G1 Node:
1 Slide the replacement power supply into the chassis until the power
supply is fully seated and the release latch snaps into place (see
Figure
52).
2 Connect the power cable to the power supply and plug the cable
into a power outlet.
3 Secure the power cable with the strap.
Allow several seconds for the system to recognize the power supply
and determine its status. The power supply status indicator turns
green to signify that the power supply is functioning properly.
4 In the remote management console, delete any administrative alerts
and close any service tickets.
Power supply
Release latch
Quantum DXi6900 G1 User's Guide
Handle
Strap

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxi6900 g1Dxi6900 g2

Table of Contents