8. Install a cylinder bracket (J) onto the first set of threaded rods.
9. Adjust the position of the nuts to ensure the bracket is aligned correctly.
10. Skip one span and install another bracket. Continue installing brackets down the line
skipping one span each time.
NUT
FIGURE 12-11: Cylinder bracket installation 1
11. Install the remaining bracket (J) in the open span(s).
FIGURE 12-12: Cylinder bracket installation 2
NOTE For larger systems with multiple rows of tanks, consider placing the cylinders into the
racking assembly at this point to ensure web assemblies will be oriented correctly.
198
NUT
Q
TOP VIEW
NUT
TOP VIEW
Q
Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
NUT
Q