1. Make sure that the selected pressure reducer corresponds to the design calculation.
2. Heed flow direction of the pressure reducer.
FIGURE 5-32: Mounting pressure reducer
1. Nozzle pipe system
2. Pressure reducer
3. High-pressure line
3. Mount the pressure reducer as connection of the high-pressure line with the nozzle pipe
system.
5.12 Mounting the pneumatic time delay
Personnel:
•
Authorized Distributor
Protective equipment:
•
Safety goggles
•
Safety gloves
•
Safety footwear
108
Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en