Viking Oxeo Installation And Maintenance Manual page 203

Inert gas extinguishing system
Table of Contents

Advertisement

12.4.8Installing the Cylinder Bracket Assemblies
1. Place the next upright post into its approximate position (for floor mount versions, install the
base support onto the post).
2. Place retaining nut (D) into the channel and push into position BEHIND the Z-bracket (F).
NOTE Use the farthest hole on the horizontal cross-piece for the first threaded rod to ensure
proper alignment.
3. Install two nuts onto the threaded rod facing opposite each other as shown.
4. Install the threaded rod into the retaining nut (D).
5. Tighten the rod until the end is flush with the back of the retaining nut. Use a finger to feel the
back side of the nut as you tighten.
6. In-between uprights, an additional wolf washer (G) is required as shown.
7. Install all threaded rod assemblies for the entire racking system before continuing.
FIGURE 12-10: Installing the cylinder bracket rods
Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
F
D
D
B
THREADED ROD
THREADED ROD
197

Advertisement

Table of Contents
loading

Related Products for Viking Oxeo

Table of Contents