Inspection And Maintenance Schedule - Viking Oxeo Installation And Maintenance Manual

Inert gas extinguishing system
Table of Contents

Advertisement

8.1 Inspection and maintenance schedule

All inspection and maintenance tasks that must be executed on the system are described in
the following chapters. Execute the tasks listed in the specified intervals, unless locally appli-
cable regulations require different intervals..
In the event of a claim, undocumented deviations from the original or maintenance
may represent a high risk with regard to a clear issue of liability. For this reason, seam-
less documentation throughout the life cycle of the complete system is a prerequisite,
in the log book as well as in the service log.
Interval
Weekly
Every 6 months
156
Maintenance work
Inspection and checks
Operating manual
Inspecting the extinguishing agent containers
Amount filled
Fill pressure
Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
Personnel
Person in charge of
the system
Qualified specialist
personnel

Advertisement

Table of Contents
loading

Related Products for Viking Oxeo

Table of Contents