RT9150E OPERATOR MANUAL
Item
Description
Power Unit Speed
Submenu, page 3-
48
3
Press the F3 button
to open the
submenu.
Settings
Submenu, page 3-
52
4
Press the F4 button
to open the
submenu.
Telescope
Submenu, page 3-
32
5
Press the F5 button
to open the
submenu.
Grove
OPERATING CONTROLS AND PROCEDURES
Graphic
1
2
3
9
10
1
2
11
3
4
8
5
1
2
7
8
3
4
11
Published 2-23-2017, Control # 644-00
Explanation
Enter percent of maximum speed
allowed for each power unit:
4
(1) Swing gear, F1
5
(2) Main hoist, F2
(3) Auxiliary hoist, F3
6
(4) Telescope, F5
(5) Lift, F6
(6) Luffing jib, F7.
Refer to Power Unit Speed Submenu,
page 3-48.
(1) Outrigger control units
(2) Setting control lever
characteristics
(3) Setting the display brightness
(4) Telescoping emergency program
access
5
(5) Lamp test
6
(6) Operating hours submenu
(7) Critical load control, on/off
7
(8) Current telescoping mechanism
status display
(9) Telescoping cylinder hydraulic
pressure
(10) Swing gear hydraulic pressure
(11) Hydraulic circuit pressure
Refer to Settings Submenu, page 3-52.
(1) Unlock section
(2) Lock section
(3) Unlock telescoping cylinder
(4) Boom length status
(5) Lock status
6
(6) Locking point alignment
(7) Telescope cylinder status
9
(8) Telescope function; on/off
(9) Telescope cylinder length
(10) Telescope cylinder location
Teleautomation on/off display
10
(11) Telescope diagram.
Refer to Telescope Submenu, page 3-
32.
3
3-23
Need help?
Do you have a question about the Grove RT9150E and is the answer not in the manual?
Questions and answers