Installing A New Cable - Manitowoc Grove RT9150E Operator's Manual

Hide thumbs Also See for Grove RT9150E:
Table of Contents

Advertisement

RT9150E OPERATOR MANUAL
5.
Remove the clamp (1) (Figure 4-3).
7592-4
4
7592-6
2
Item
1
Clamp
2
Pouch
3
Cable Hole
4
Cable Wedge
6.
Push the cable through the hole (3) (Figure 4-3) until the
cable wedge (4) slides out of the pouch (2).
7.
Remove the cable wedge and place the cable away from
the crane.

Installing a New Cable

WARNING
Entanglement Hazard!
Keep all body parts and loose clothing clear while hoist is
running.
Death or serious injury may result if entanglement occurs
during hoist operations.
Grove
4
1
FIGURE 4-3
3
Description
Published 2-23-2017, Control # 644-00
If cable is wound from the storage drum, the reel should
be rotated in the same direction as the hoist.
Damage to the wire rope may occur.
1
1.
Tension the cable slightly while winding it onto the drum.
2.
Place the reel stand (1) (Figure 4-4) with the new cable
in front of the main boom head.
2
3.
Guide cable over the head sheave (2) (Figure 4-4) up to
the hoist drum.
7592-7
4.
Guide the cable through the hole (3) (Figure 4-5) until it
extends about 5.0 ft (1.5 m) beyond the pouch (2)
(Figure 4-5).
5.
Feed the free end of the cable back through the pouch
(2) (Figure 4-5).
4
7592-8
6.
Secure the clamp (1) (Figure 4-5) and tighten it. Torque
to 58 lb-ft (79 Nm).
7.
Place the cable wedge (4) (Figure 4-5) in the loop.
SET-UP AND INSTALLATION
CAUTION
2
1
FIGURE 4-4
1
3
FIGURE 4-5
2
4
4-3

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove RT9150E and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF