Figure 119: Tightening The Screws On The Outer Rails - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 9: Installing the Switch in the RKMT-SL01 Sliding Rack
186
Warning
Pull the switch out slowly if you must remove it from the rack for
maintenance. If you pull the switch out past the front of the rack
posts, or if you pull it out too quickly, there is a risk that the weight of
the switch will cause the sliding rail assemblies to fail and cause the
switch to fall out.
5. Finish tightening the eight screws on the outer rails to secure the rails
to the equipment rack. See Figure 119.
Figure 119. Tightening the Screws on the Outer Rails
This completes the installation procedure.
E59

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents