Installing The Inner Rails On The Switch; Figure 113: Inner Rail Screw Holes For The X950-28Xsq And X950-28Xtqm Switches; Figure 114: Inner Rail Screw Holes For The X950 Switch - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 9: Installing the Switch in the RKMT-SL01 Sliding Rack

Installing the Inner Rails on the Switch

Front of
Switch
Front of
Switch
182
The sides of the x950-28XSQ and x950-28XTQm switches have two sets
of bracket screw holes. The smaller M3 holes are for the standard
brackets that come with the switch and the larger M4 screw holes are for
the inner rails of the RKMT-SL01 sliding rack. The inner rails are attached
to the switch with four M4 screws on each side. Figure 113 identifies the
respective screw holes on the sides of the switch and inner rails.
Figure 113. Inner Rail Screw Holes for the x950-28XSQ and x950-
The x950-52XSQ switch has only M4 holes on its two sides. The holes are
used for both the standard brackets included with the device and the rails
for the sliding equipment rack. Figure 114 identifies the screw holes for
attaching the inner rails to the switch.
Figure 114. Inner Rail Screw Holes for the x950 Switch
Attach the inner rails to the switch using eight M4 screws included with the
sliding rack. Be sure that the UP arrows on the rails are pointing up and
that the extension brackets extend in front of the switch. Refer to Figure
115 on page 183.
28XTQm Switches

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents