Chapter 7: Installing The Switch In An Equipment Rack - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 7
Installing the Switch in an Equipment
Rack
This chapter contains instructions for installing the switch in a standard 19-
inch equipment rack. The procedures in this chapter are listed here:
"Beginning the Installation" on page 140
"Removing the Bumper Feet" on page 142
"Installing the Switch" on page 143
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents