Installation Overview

The following steps summarize the installation procedure for the RKMT-
SL01 Rack Mount Kit:
1. Verify the contents of the shipping box. Refer to "Unpacking the
Shipping Container" on page 172.
2. Attach the outer rails to the equipment rack. Refer to "Installing the
Outer Rails on the Equipment Rack" on page 174.
3. Determine the lengths of the extension brackets and install the
brackets on the inner rails. Refer to "Installing the Extension Brackets
on the Inner Rails" on page 176.
4. Attach the inner rails to the switch. Refer to "Installing the Inner Rails
on the Switch" on page 182.
5. Slide the switch into the outer rails. Refer to "Installing the Switch in the
Equipment Rack" on page 184.
x950 Series Installation Guide for VCStack