Figure 54: Tightening The Two Captive Screws On The Ethernet Line Card - Allied Telesis AT-x950-28XSQ Installation Manual

Virtual chassis stacking. advanced layer 3+ switch
Hide thumbs Also See for AT-x950-28XSQ:
Table of Contents

Advertisement

Figure 54. Tightening the Two Captive Screws on the Ethernet Line Card
7. After installing the power supplies and optional XEM2 Line Card, go to
one of the following chapters:
Chapter 5, "Installing the Switch on a Table" on page 91
Chapter 6, "Installing the Switch in an Equipment Rack" on page 95
Chapter 7, "Installing the Switch on a Wall" on page 103
AT-x950-28XSQ Switch and VCStack Installation Guide
89

Advertisement

Table of Contents
loading

Table of Contents