Figure 38: Tightening The Two Captive Screws On The Ethernet Line Card - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Figure 38. Tightening the Two Captive Screws on the Ethernet Line Card
7. After installing the power supplies and optional XEM2 Line Card, go to
one of the following chapters:
Chapter 4, "Installing the Switch on a Table" on page 81
Chapter 5, "Installing the Switch in an Equipment Rack" on page 85
Chapter 6, "Installing the Switch on a Wall" on page 93
x950 Series Installation Guide for Stand-alone Switches
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents