Installing The Plywood Base - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Installing the Plywood Base

A plywood base is recommended when installing the switch on a wall that
has wooden studs. Refer to "Plywood Base for a Wall with Wooden Studs"
on page 151. Consult a qualified building contractor for installation
instructions for the plywood base. The installation guidelines are listed
here:
You should use a stud finder to identify the middle of studs and hot
electrical wiring in the wall.
You should attach the base to two wall studs with a minimum of
four screws.
The selected wall location for the base should adhere to the
recommendations in "Choosing a Site for the Chassis" on
page 104 and "Recommended Minimum Wall Area Dimensions" on
page 149.
x950 Series Installation Guide for VCStack
155

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents