Chapter 9: Installing the Switch in the RKMT-SL01 Sliding Rack

Installing the Switch in the Equipment Rack

184
After attaching the inner rails and extension brackets to the switch,
perform the following procedure to install the switch in the sliding rack:
Warning
When installing or removing the switch from the rack, disconnect the
media and power cables.
1. Install the switch in the sliding rack by sliding the inner rails into the
outer rail grooves. Refer to Figure 116.
Figure 116. Sliding the Inner Rails on the Switch into the Outer Rails
Warning
Be careful to not drop the switch or pinch your fingers when inserting
it into the sliding rack.
2. Affix the provided warning labels to the top and bottom of the switch, in
locations immediately visible when removing the device from the rack.
Refer to Figure 117 on page 185.