Sign In
Upload
Manuals
Brands
Allied Telesis Manuals
Switch
SwitchBlade x3106
Allied Telesis SwitchBlade x3106 Manuals
Manuals and User Guides for Allied Telesis SwitchBlade x3106. We have
1
Allied Telesis SwitchBlade x3106 manual available for free PDF download: Installation Manual
Allied Telesis SwitchBlade x3106 Installation Manual (288 pages)
Brand:
Allied Telesis
| Category:
Switch
| Size: 5 MB
Table of Contents
Installation Guide
1
Electrical Safety and Emissions Standards
3
Translated Safety Statements
4
Table of Contents
5
Preface
15
Safety Symbols Used in this Document
16
Contacting Allied Telesis
17
Chapter 1: Overview of the Chassis and Power Supplies
19
Sbx3106 Chassis
20
Figure 1: AT-Sbx3106 Chassis
20
Figure 2: Front View of the AT-Sbx3106 Chassis
21
Figure 3: Rear View of the AT-Sbx3106 Chassis
21
Figure 4: AT-Sbx3106 Chassis with Line Cards, Controller Cards, and Power Supplies
22
Slots for the Ethernet Line and Controller Cards
23
Figure 5: Slots for the Ethernet Line and Controller Cards
23
Power Supplies and Power Supply Slots
24
Figure 6: Power Supply Units
24
Figure 7: Power Supply Slots
25
Leds
26
Table 1. Leds on the AT-Sbxpwrsys1 and AT-Sbxpwrsys2 AC System Power Supplies
27
Table 2. Leds on the AT-Sbxpwrsys1 DC System Power Supply
27
Table 3. Leds on the AT-Sbxpwrpoe1 AC Poe Power Supply
28
AT-Sbxfan06 Module
29
Led
29
Figure 8: AT-Sbxfan06 Module
29
Table 4. AT-Sbxfan06 Module LED
29
Power Supply Interfaces (Opto-Couplers)
30
Led
30
Figure 9: Power Supply Interfaces (Opto-Couplers)
30
Table 5. Power Supply Interface LED
30
Chapter 2: Overview of the Ethernet Line Cards
31
Ethernet Line Cards
32
Figure 10: Ethernet Line Cards
32
AT-Sbx31Gt24 Line Card
33
Leds
33
Figure 11: AT-Sbx31Gt24 Line Card
33
Figure 12: Port Leds on the AT-Sbx31Gt24 Line Card
34
Table 6. Port Leds on the AT-Sbx31Gt24 Line Card
34
AT-Sbx31Gt40 Line Card
35
Figure 13: AT-Sbx31Gt40 Line Card
35
Figure 14: Port Leds on an RJ Point 5 Cable Connector for the AT-Sbx31Gt40 Line Card
36
Figure 15: Link/Activity LED on an RJ Point 5 Cable Connector for the AT-Sbx31Gt40 Line Card
36
Leds
36
Table 7. Port Leds for the AT-Sbx31Gt40 Line Card
37
AT-Sbx31Gp24 Poe Line Card
38
Figure 16: AT-Sbx31Gp24 Poe Line Card
38
Figure 17: Port Leds on the AT-Sbx31Gp24 Poe Line Card
39
Leds
39
Table 8. Port Leds on the AT-Sbx31Gp24 Poe Line Card
39
AT-Sbx31Gs24 SFP Line Card
41
Leds
41
Figure 18: AT-Sbx31Gs24 SFP Line Card
41
Figure 19: Port Leds on the AT-Sbx31Gs24 SFP Line Card
42
Table 9. Port Leds on the AT-Sbx31Gs24 SFP Line Card
42
AT-Sbx31Gc40 Line Card
43
Figure 20: AT-Sbx31Gc40 Line Card
43
Port Numbers
44
Figure 21: Port Numbers for Slots with CSFP Transceivers
45
Figure 22: Port Numbers for Slots with Standard SFP Transceivers
46
Figure 23: Leds for the AT-Sbx31Gc40 Line Card
46
Leds
46
Figure 24: Leds for the AT-Sbx31Gc40 Line Card, with CSFP Transceivers
47
Figure 25: Leds for the AT-Sbx31Gc40 Line Card, with SFP Transceivers
47
Table 10. Transceiver Slot Leds on the AT-Sbx31Gc40 Line Card
48
AT-Sbx31Xz4 XFP Line Card
49
Leds
49
Figure 26: AT-Sbx31Xz4 XFP Line Card
49
Figure 27: Transceiver Slot Leds on the AT-Sbx31Xz4 XFP Line Card
50
Table 11. Transceiver Slot Leds on the AT-Sbx31Xz4 XFP Line Card
50
AT-Sbx31Xs6 SFP+ Line Card
51
Leds
51
Figure 28: AT-Sbx31Xs6 Line Card
51
Figure 29: SFP+ Slot Leds on the AT-Sbx31Xs6 Line Card
52
Table 12. SFP+ Slot Leds on the AT-Sbx31Xs6 Line Card
52
10/100/1000Base-T Twisted Pair Ports
53
Connector Type
53
Speed
53
Duplex Mode
53
Maximum Distance
54
Cable Requirements
54
Table 13. Twisted Pair Cable for the AT-Sbx31Gt24 and AT-Sbx31Gt40 Line Cards
54
Automatic MDIX Detection
55
Straight-Through or Crossover Cabling
55
Table 14. Twisted Pair Cable for the AT-Sbx31Gp24 Line Card
55
Port Pinouts
56
Power over Ethernet on the AT-Sbx31Gp24 Line Card
57
Powered Device Classes
57
Table 15. Ieee802.3Af and Ieee802.3At Powered Device Classes
57
Power Budgeting
58
Poe Wiring
58
Table 16. Maximum Number of Powered Devices
58
Chapter 3: Overview of the AT-Sbx31Cfc960 Controller Fabric Card
61
Controller Fabric Cards for the AT-Sbx3106 Chassis
62
Figure 30: Controller Fabric Cards for the AT-Sbx3106 Chassis
62
Table 17. Differences between the AT-Sbx31Cfc and AT-Sbx31Cfc960 Controller Fabric Cards
62
Hardware Components on the AT-Sbx31Cfc960 Card
64
Figure 31: AT-Sbx31Cfc960 Controller Fabric Card
64
Table 18. Components on the AT-Sbx31Cfc960 Controller Fabric Card
64
Guidelines
66
Dual Controller Cards
68
SYS Status Leds
69
Table 19. SYS (System) Status Leds
69
Eco-Friendly Button
70
Sbx Linecard Status Leds
71
Table 20. Sbx Linecard Status Leds
71
SFP+ Slots
72
Table 21. Leds for the SFP+ Slots on the AT-Sbx31Cfc960 Controller Card
72
Console (RS-232) Port
73
NET MGMT Port
74
Table 22. Management Features Requiring Network Access
74
NET MGMT Port LED
76
Table 23. NET MGMT Port LED
76
USB Port
77
Reset Button
78
Release Activation and Feature Licenses
80
Chapter 4: Safety Precautions and Site Preparation
81
Reviewing Safety Precautions
82
Selecting a Site for the Switchblade X3106
86
Figure 32: 100 - 125 VAC 125 V NEMA 5-20 Plug and Receptacle
87
Installation Tools and Material
88
Chapter 5: Installing the Chassis on a Table or in an Equipment Rack
89
Unpacking the AT-Sbx3106 Chassis
90
Figure 33: AT-Sbx3106 Chassis Items
90
Figure 34: AT-Sbx3106 Chassis Items (Continued)
91
Installing the Chassis on a Table
92
Installing the Chassis in an Equipment Rack
93
Required Tools and Material
93
Preparing the Equipment Rack
93
Figure 35: Reserving Vertical Rack Space
94
Removing the Rubber Feet
95
Figure 36: Rack Mounting Hole Locations
95
Adjusting the Equipment Rack Brackets
96
Figure 37: Turning the Chassis Upside down
96
Figure 38: Removing the Rubber Feet
96
Table 24. Front Panel to Rack Rail Dimensions
97
Figure 39: Rack Mounting Bracket Locations
98
Figure 40: Rack Bracket Locations for Reverse Position of Chassis
98
Installing the Chassis in the Equipment Rack
99
Figure 41: Lifting the AT-Sbx3106 Chassis into the Equipment Rack
100
Figure 42: Installing the Rack Mount Screws
100
Figure 43: Tightening the Rack Mount Screws
101
Removing the Shipping Brace
102
Figure 44: Removing the Shipping Brace
102
Installing the Chassis Grounding Lug
103
Figure 45: Stripping the Grounding Wire
103
Figure 46: Removing the Grounding Lug
103
Figure 47: Attaching the Grounding Wire to the Grounding Lug
104
Figure 48: Installing the Grounding Lug and Wire
104
Chapter 6: Installing the Power Supplies
105
Protecting against Electrostatic Discharge (ESD)
106
Figure 49: ESD Socket and Wrist Strap
106
Installing the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC System Power Supply
107
Figure 50: Power Supply Slots
107
Figure 51: Removing the Blank Slot Cover from Power Supply Slot C
108
Figure 52: Items Included with the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC System Power Supply
109
Figure 53: Raising the Handle on the Power Supply
110
Figure 54: Inserting the AT-Sbxpwrsys1 AC or AT-Sbxpwrsys2 Power Supply
110
Figure 55: Lowering the Handle on the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC Power Supply
111
Installing the AT-Sbxpwrpoe1 AC Power Supply
113
Figure 56: Removing the Blank Slot Cover from Power Supply Slot a
113
Figure 57: Items Included with the AT-Sbxpwrpoe1 Power Supply Module
114
Figure 58: Raising the Handle on the AT-Sbxpwrpoe1 AC Power Supply
115
Figure 59: Inserting the AT-Sbxpwrpoe1 AC Power Supply
115
Figure 60: Locking the Handle on the AT-Sbxpwrpoe1 AC Power Supply
116
Installing the AT-Sbxpwrsys1 DC System Power Supply
118
Figure 61: Removing the Blank Slot Cover from Power Supply Slot C
119
Figure 62: Items Included with the AT-Sbxpwrsys1 DC System Power Supply Module
120
Figure 63: Loosening the Handle Locking Screw on the AT-Sbxpwrpoe1 DC System Power Supply
121
Figure 64: Raising the Handle on the AT-Sbxpwrpoe1 DC System Power Supply
121
Figure 65: Inserting the AT-Sbxpwrsys1 DC System Power Supply
122
Figure 66: Locking the Handle on the AT-Sbxpwrsys1 DC System Power Supply
123
Chapter 7: Installing the AT-Sbx31Cfc960 Card and Ethernet Line Cards
125
Guidelines to Handling the Controller and Line Cards
126
Figure 67: Aligning a Card in a Slot
127
Installing the AT-Sbx31Cfc960 Controller Fabric Card
128
Figure 68: Slots 4 and 5 for the AT-Sbx31Cfc960 Card
128
Figure 69: Items Included with the AT-Sbx31Cfc960 Controller Fabric Card
129
Figure 70: Removing the AT-Sbx31Cfc960 Controller Fabric Card from the Anti-Static Bag
129
Figure 71: Removing the Battery Insulator
130
Figure 72: Opening the Locking Handles on the AT-Sbx31Cfc960 Controller Fabric Card
130
Figure 73: Aligning the AT-Sbx31Cfc960 Card in the Chassis Slot
131
Figure 74: Closing the Locking Levers on the AT-Sbx31Cfc960 Controller Fabric Card
132
Figure 75: Tightening the Thumb Screws on the AT-Sbx31Cfc960 Card
133
Installing the Ethernet Line Cards
134
Figure 76: Removing an Ethernet Line Card from an Anti-Static Bag
135
Figure 77: Aligning an Ethernet Line Card in a Chassis Slot
135
Figure 78: Seating an Ethernet Line Card on the Backplane Connector
136
Figure 79: Tightening the Thumb Screws on an Ethernet Line Card
137
Installing the Blank Slot Covers
138
Figure 80: Installing a Blank Slot Cover
138
Figure 81: Tightening the Thumbscrews on a Blank Slot Cover
139
Chapter 8: Installing the Transceivers and Cabling the Ports
141
Guidelines to Cabling the Twisted Pair Ports on AT-Sbx31Gp24, AT-Sbx31Gt24, and AT-Sbx31Gt40 Line Cards
142
Guidelines to Cabling the Twisted Pair Ports on AT-Sbx31Gp24, AT- Sbx31Gt24, and AT-Sbx31Gt40 Line Cards
142
Connecting Cables to the AT-Sbx31Gt40 Line Card
143
Figure 82: RJ Point 5 Cable Connector for AT-Sbx31Gt40 Line Card
143
Figure 83: Connecting Cables to Ports on the AT-Sbx31Gt40 Line Card
144
Guidelines to Installing SFP, SFP+, CSFP, and XFP Transceivers
145
Installing SFP Transceivers in the AT-Sbx31Gs24 Line Card
146
Figure 84: Removing the Dust Cover from an SFP Slot in the AT-Sbx31Gs24 Line Card
146
Figure 85: Handle on SFP Transceiver
146
Figure 86: Inserting an SFP Transceiver in the AT-Sbx31Gs24 Line Card
147
Figure 87: Removing the Dust Cover from the SFP Transceiver in the AT-Sbx31Gs24 Line Card
147
Figure 88: Attaching a Fiber Optic Cable to an SFP Transceiver in the AT-Sbx31Gs24 Line Card
148
Installing SFP and CSFP Transceivers in the AT-Sbx31Gc40 Line Card
149
Figure 89: Removing the Dust Cover from a Transceiver Slot on the AT-Sbx31Gc40 Line Card
149
Figure 90: Labels on SFP and CSFP Transceivers
150
Figure 91: Inserting an SFP or a CSFP Transceiver
150
Figure 92: Removing the Dust Cover from an SFP or a CSFP Transceiver
151
Figure 93: Attaching a Fiber Optic Cable
152
Installing SFP+ Transceivers in the AT-Sbx31Xs6 Line Card
154
Figure 94: Removing a Dust Cover from an SFP+ Slot in the AT-Sbx31Xs6 Line Card
154
Figure 95: Handle on SFP+ Transceiver
155
Figure 96: Installing an SFP+ Transceiver in the AT-Sbx31Xs6 Line Card
155
Figure 97: Removing the Dust Cover from an SFP+ Transceiver in the AT-Sbx31Xs6 Line Card
156
Figure 98: Attaching a Fiber Optic Cable to an SFP+ Transceiver in the AT-Sbx31Xs6 Line Card
157
Installing AT-SP10TW Cables in the AT-Sbx31Xs6 Line Card
158
Figure 99: Release Tab on the AT-Sbx31Xs6 Line Card
158
Figure 100: Installing the AT-SP10TW Cable in the AT-Sbx31Xs6 Line Card
159
Installing XFP Transceivers in the AT-Sbx31Xz4 Line Card
160
Figure 101: Removing the Dust Cover from an XFP Slot on the AT-Sbx31Xz4 Line Card
160
Figure 102: Handle on the XFP Transceiver
161
Figure 103: Installing an XFP Transceiver in the AT-Sbx31Xz4 Line Card
161
Figure 104: Removing the Protective Cover from an XFP Transceiver in the AT-Sbx31Xz4 Line Card
162
Figure 105: Attaching a Fiber Optic Cable to an XFP Transceiver in the AT-Sbx31Xz4 Line Card
163
Cabling the NET MGMT Port on the AT-Sbx31Cfc960 Card
164
Installing SFP or SFP+ Transceivers in the AT-Sbx31Cfc960 Card
166
Figure 106: Removing a Dust Cover from a Transceiver Slot in the AT-Sbx31Cfc960 Controller Fabric Card
166
Figure 107: Handle on an SFP or SFP+ Transceiver
167
Figure 108: Installing an SFP or SFP+ Transceiver in the AT-Sbx31Cfc960 Controller Fabric Card
167
Figure 109: Removing the Dust Cover from an SFP or SFP+ Transceiver in the AT-Sbx31Cfc960 Controller Fabric Card
168
Figure 110: Attaching a Fiber Optic Cable to an SFP or SFP+ Transceiver in the AT-Sbx31Cfc960 Controller Fabric Card
168
Chapter 9: Powering on the Chassis
171
Verifying the Installation
172
Powering on the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC System Power Supply
173
Figure 111: AC Sockets on the AT-Sbx3106 Chassis Rear Panel
173
Figure 112: Connecting the AC Power Cord for the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC System Power Supply
174
Figure 113: Securing the Power Cord for the AT-Sbxpwrsys1 or AT-Sbxpwrsys2 AC System Power Supply to an Anchor
175
Powering on the AT-Sbxpwrpoe1 AC Poe Power Supply
176
Figure 114: Connecting the AC Power Cord for the AT-Sbxpwrpoe1 Power Supply
176
Figure 115: Securing the Power Cord for the AT-Sbxpwrpoe1 Power Supply to an Anchor
177
Figure 116: Dress and Secure AC Power Cords
178
Powering on the AT-Sbxpwrsys1 DC System Power Supply
179
Figure 117: Components of the AT-Sbxpwrsys1 DC Power Supply
180
Choosing a Method for Attaching the Grounding Wire
181
Connecting the Grounding Wire with the Grounding Terminal
181
Figure 118: Grounding Wire Terminal
181
Figure 119: Stripping the Stranded Grounding Wire
181
Figure 120: Attaching the Stranded Grounding Wire to the Grounding Terminal
181
Figure 121: Removing the Nut and Washer from the Grounding Post
182
Figure 122: Installing the Grounding Wire
183
Connecting the Grounding Wire with Bare Wire
184
Figure 123: Stripping the Solid or Stranded Grounding Wire
184
Figure 124: Attaching the Bare Grounding Wire to the Grounding Post
184
Choosing a Method for Attaching the Power Wires
185
Figure 125: Securing the Bare Grounding Wire to the Grounding Post
185
Figure 126: Power Wire Terminals
185
Connecting the DC Power Wires with the Straight Terminals
186
Figure 127: Stripping the Power Wires
186
Figure 128: Attaching the Power Wires to the Power Terminal Lugs
187
Figure 129: On/Off Switch on the AT-Sbxpwrsys1 DC Power Supply
187
Figure 130: Opening the Plastic Cover
188
Figure 131: Removing the Terminal Screws
188
Figure 132: Connecting the Positive (+) Power Wire with a Straight Terminal
189
Figure 133: Connecting the Negative (-) Power Wire with a Straight Terminal
190
Figure 134: Closing the Plastic Cover over the Terminal Connectors
191
Figure 135: Tightening the Handle Locking Screw
192
Connecting the DC Power Wires with the Right Angle Terminals
193
Figure 136: Stripping the Power Wires
193
Figure 137: Attaching the Power Wires to the Right Angle Terminals
193
Figure 138: Removing the Plastic Cover
194
Figure 139: Removing the Terminal Screws
195
Figure 140: Connecting the Positive (+) Power Wire with a Right Angle Terminal
196
Figure 141: Connecting the Negative (-) Power Wire with a Right Angle Terminal
197
Figure 142: Tightening the Handle Locking Screw
198
Connecting Bare DC Power Wires
199
Figure 143: Stripping Solid or Stranded DC Power Wires
199
Figure 144: Connecting the Positive Wire
200
Figure 145: Connecting the Negative Lead Wire
201
Monitoring the Initialization Process
203
Using the Leds to Monitor the Initialization Process
204
Table 25. Switch Initialization Phases
204
Using the Console Port to Monitor the Initialization Process
205
Figure 146: Switch Initialization Messages
205
Figure 147: Switch Initialization Messages (Continued)
206
Figure 148: Switch Initialization Messages (Continued)
207
Chapter 10: Verifying the Hardware Operations of the Chassis
209
Using the Leds to Verify the Chassis
210
Using Local Management to Verify the Chassis
212
Starting a Local Management Session
212
Figure 149: Connecting the Management Cable to the Console RS-232 Port
212
Entering the Management Software Commands
213
Figure 150: SHOW PSU Command
213
Figure 151: SHOW FANMODULE Command
214
Figure 152: SHOW CARD Command
214
Running the Easy Startup Application
216
Chapter 11: Upgrading to the AT-Sbx31Cfc960 Card from the AT-Sbx31Cfc Card
221
Guidelines
222
Upgrading the Controller Fabric Cards
223
Chapter 12: Troubleshooting
227
AT-Sbxpwrsys1, AT-Sbxpwrsys2, or AT-Sbxpwrpoe1 AC Power Supply
228
AT-Sbxpwrsys1 DC System Power Supply
230
Ethernet Line Cards
232
Twisted Pair Ports
234
Power over Ethernet
236
Fiber Optic Transceivers
238
AT-Sbx31Cfc960 Controller Fabric Card
240
AT-Sbxfan06 Fan Module
243
Local (Out-Of-Band) Management Session
244
Power Supply Interfaces (Opto-Couplers)
245
Chapter 13: Replacing Modules
247
Replacing the AT-Sbxpwrsys1, AT-Sbxpwrsys2, or AT-Sbxpwrpoe1 AC Power Supply
248
Replacing the AT-Sbxpwrsys1, AT-Sbxpwrsys2, or AT- Sbxpwrpoe1 AC Power Supply
248
Figure 153: Disconnecting the AC Power Cord from the AC Socket on the Back Panel
249
Figure 154: Lifting the Locking Handle on the Power Supply
250
Figure 155: Removing the Power Supply from the Chassis
251
Figure 156: Installing a Blank Power Supply Slot Cover
252
Figure 157: Lowering the Locking Handle on the Power Supply Slot Cover
253
Replacing the AT-Sbxpwrsys1 DC Power Supply
254
Figure 158: Loosening the Screw on the Locking Handle
255
Figure 159: Opening the Plastic Window on the Terminal Block
256
Figure 160: Removing the Negative Lead Wire
257
Figure 161: Removing the Positive Lead Wire from the Terminal Block
258
Figure 162: Reinstalling the Screws on the Positive and Negative Terminals
259
Figure 163: Closing the Plastic Cover
260
Figure 164: Removing the Grounding Wire
261
Figure 165: Reinstalling the Nut and Washer on the Grounding Post
262
Figure 166: Lifting the Locking Handle and Removing the Power Supply
263
Figure 167: Installing a Blank Power Supply Slot Cover
264
Figure 168: Lowering the Locking Handle on the Power Supply Slot Cover
265
Replacing Ethernet Line Cards
266
Replacing the AT-Sbx31Cfc960 Controller Fabric Card
269
Replacing the AT-Sbxfan06 Fan Module
272
Removing the AT-Sbxfan06 Fan Module
272
Figure 169: Loosening the Screw on the AT-Sbxfan06 Fan Module
273
Figure 170: Loosening the AT-Sbxfan06 Fan Module from the Backplane Connector
273
Figure 171: Withdrawing the AT-Sbxfan06 Fan Module 25 MM (1 In.) from the Chassis
274
Installing a New AT-Sbxfan06 Fan Module
275
Figure 172: Removing the AT-Sbxfan06 Fan Module from the Chassis
275
Figure 173: Installing a New AT-Sbxfan06 Fan Module
276
Figure 174: Securing the AT-Sbxfan06 Fan Module on the Backplane Connector
277
Figure 175: Tightening the Screw on the AT-Sbxfan06 Fan Module
277
Appendix A: Technical Specifications
279
Physical Specifications
279
Table 26. Product Dimensions
279
Table 27. Product Weights
279
Environmental Specifications
281
Table 28. Environmental Specifications
281
Table 29. Acoustic Noise Test Components
281
Power Specifications
282
Table 30. AC Voltage and Frequency Requirements
282
Table 31. DC Voltage Requirement
282
Table 32. Typical Power Savings in Eco-Friendly Mode
282
Table 33. Maximum Power Consumption
282
Table 34. Maximum Power Efficiency
283
Table 35. Heat Dissipation
283
Table 36. Available Power over Ethernet with One Poe Power Supply
284
Table 37. Available Power over Ethernet with Two Poe Power Supplies
284
Table 38. Poe Mode
284
Safety and Electromagnetic Emissions Certifications
285
Table 39. Safety and Electromagnetic Emissions
285
Port Pinouts
286
Figure 176: Pin Numbers for RJ-45 and RJ Point 5 Ports
286
Table 40. MDI Pin Signals (10Base-T or 100Base-TX)
286
Table 41. MDI-X Pin Signals (10Base-T or 100Base-TX)
286
Table 42. 1000Base-T Connector Pinouts
287
Advertisement
Advertisement
Related Products
Allied Telesis x3100 Series
Allied Telesis x310-26FT
Allied Telesis x310-26FP
Allied Telesis x310-50FP
Allied Telesis x310-50FT
Allied Telesis SwitchBlade x3112
Allied Telesis x320-10GH
Allied Telesis x330-10GTX
Allied Telesis x330 Series
Allied Telesis x320-11GPT
Allied Telesis Categories
Switch
Network Router
Media Converter
Network Hardware
Wireless Access Point
More Allied Telesis Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL