6. Insert the four anchors into the holes.
7. Have two people hold the switch at the selected wall location while you
secure it to the wall with the four provided screws. Refer to Figure 95.
Figure 95. Installing the Switch on a Concrete Wall
8. Do one of the following:
To install the power supplies, go to "Installing PWR600 AC Power
Supplies" on page 116.
To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 130.
After installing the switches of the stack, go to Chapter 10,
"Configuring the Master Switch" on page 187.
x950 Series Installation Guide for VCStack
161