What To Do Next; Figure 125: Powering Off The Ac Power Supply - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 10: Configuring the Master Switch

What to Do Next

208
After configuring the master switch, do the following:
1. Power off the switch by performing the following:
For the DC power supply, power off the DC power source units.
For the AC power supply, disconnect the AC power cords from the
AC power sources. Refer to Figure 125.
Figure 125. Powering Off the AC Power Supply
2. Configure the member switches, as explained in Chapter 11,
"Configuring Member Switches" on page 209.
3. After configuring the master and member switches, verify that all the
units are powered off.
4. Cable the ports of the stack trunk. Refer to Chapter 13, "Cabling the
Networking Ports" on page 225.
5. Power on the switches of the stack. Refer to "Powering on the Stack"
on page 222.
6. Verify that the switches formed the stack. Refer to "Verifying the Stack"
on page 223.
7. Cable the networking ports. Refer to Chapter 13, "Cabling the
Networking Ports" on page 225.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents